Old Vinyl Factory, Hayes
Client – Weston Homes Plc.
Location – Blythe Road, Hayes, London.
Scope – Full design scaffolding for new build residential.
Materials Used – Tube and fittings, ReadyLok Transom Unit’s, Adjustable Transoms, Internal Hop Up Brackets, Layher System Staircases, Fire Retardant Debris Netting and Plastic Sheeting, 450mm Haki Beams and 750mm Apollo X Beams.
Duration – 52 weeks.
WSL were engaged to deliver a full traditional access scaffold for new build residential blocks. The works consisted of 3 blocks, in total 168 units. The blocks were raised to 8 floors. The build consisted of RC Frame with Uni Panels and brickwork cladding.